Onze Kas | Hotel in Lelystad

8.1 (235 Reviews) |  4 Bathrooms  8 Guests
Lelystad Hotel | Onze Kas

Hotel in Lelystad

Onze Kas features a seasonal outdoor swimming pool, garden, a shared lounge and terrace in Lelystad. The property provides a shared kitchen and free WiFi. The rooms in the hotel are equipped with a flat-screen TV. Featuring a private bathroom with a shower and bathrobes, rooms at Onze Kas also have a garden view. All guest rooms will provide guests with a closet and a coffee machine. Dinoland Zwolle is 30 miles from the accommodation. Schiphol Airport is 42 miles away.

Onze Kas is located in Lelystad.

This 4 Bedrooms Hotel is suitable for tourists and travelers. It has several amenities that would guarantee your comfort. These amenities include: Parking, Pool, Ocean View, and several others. This is a good star rated property and has over 235 reviews with the average score of 8.1 . Coming to Lelystad and needing a place to stay? Be it for work or for leisure, consider staying at this Hotel for your next visit, you will surely love it.

You can check the reviews and description of this 4 Bedrooms Hotel if you want to learn more about this RBO place in Lelystad. These details are authentic, as they are provided by our partner, booking.com.

This Onze Kas in Lelystad is well equipped and has all facilities that have been listed below. Please note that these details were shared to us by booking.com for the listed “Onze Kas”. We solely rely on their shared details and are regarded as “accurate”. If you have any concerns about the information or accuracy describing this Hotel, please let us know.

Show more
 
110 Groene Velden, Lelystad, 8211 BC, Netherlands

Amenities

Parking
Pool
TV
View
Ocean View
Balcony/Terrace
Oceanfront
Security/Safety
Sports/Activities
Fireplace/Heating
Guest Services
Entertainment
Child Friendly
Internet
Kitchen

Facility Overview

Kitchen
  • Shared kitchen
Parking
  • Parking on site
  • Free parking
  • Parking
Activities
  • Bike tours
  • Walking tours
  • Game room
Entertainment
  • Board games/Puzzles
General
  • Non-smoking rooms
  • Heating
  • Smoke-free property
  • Family rooms
Guest Services
  • Express check-in/out
  • Shared lounge/TV area
  • Baggage storage
  • Invoice provided
Internet
  • Wifi
  • Internet
  • Free Wifi
Outdoors
  • Outdoor pool
  • Garden
  • Outdoor pool (seasonal)
  • Outdoor furniture
  • Terrace
Security/Safety
  • Smoke alarms
  • Key card access
  • Fire extinguishers
  • Property cleaned by professional cleaning companies
  • Linens, towels, and laundry washed in accordance with local authority guidelines
  • Guest accommodation sealed after cleaning
  • Physical distancing in dining areas
  • All plates, cutlery, glasses, and other tableware sanitized
  • First aid kits available
  • Staff follow all safety protocols as directed by local authorities
  • Shared stationery (e.g. printed menus, magazines, pens, paper) removed
  • Process in place to check health of guests
  • Physical distancing rules followed
  • Contactless check-in/out
  • Cashless payment available
Spa
  • Swimming pool
  • Saltwater pool
  • Beach chairs/Loungers
  • Heated pool
  • Pool cover

Policies

Check-in
The minimum age for check-in is 18
Cancellation policy
Free cancellation
Payment Policy
Credit card required
Pet Policy
Pets are not allowed
If you want to bring a dog, note that the fee for a dog is 7,50 eur a day, camping beds are also available for 15 eur per stay, payment before arrival by bank transfer is required. the property will contact you after you book to provide instructions.this property does not accommodate bachelor(ette) or similar parties, guests under the age of 18 can only check in with a parent or official guardian.

Reviews

Value for money:
7.95
Location:
8.47
Staff:
8.39
Facilities:
8.15
Comfort:
8.7
Cleanliness:
8.76
Ernest
Nov 3, 2024 07:00:00 AM
Review Score:   8
Netherlands
Reviewer Type: Couple
Travel Purpose: business
See All Reviews

Room Arrangement

Room InfoFacilities
Double Room
Room Type: Double
Room Size: 18 m2
1 Queen bed(s) Bed
Double Room

Food & Drink

Tea/Coffee maker

Bathroom

Toilet paper, Toilet, Shower, Private bathroom, Towels, Bathtub or shower, Bathrobe, Shampoo

Media & Technology

Flat-screen TV, TV

Bedroom

Wardrobe or closet, Childrens' cribs, Extra long beds (> 6.5 ft), Linens

General

Trash cans, Smoke Alarm, Carbon monoxide detector, Carbon monoxide sources, Heating, Key card access

View

Garden view, View

Kitchen

Electric kettle, Coffee machine

Outdoors

Terrace

Accessibility

Entire unit wheelchair accessible, Hearing accessible, Entire unit located on ground floor

Room Amenities

Socket near the bed, Clothes rack, Drying rack for clothing

Entertainment & Family Services

Books, DVDs or music for children, Board games/puzzles

Pool and Spa

Pool towels, Pool cover, Heated pool, Saltwater pool
Double Room
Room Type: Double
Room Size: 21 m2
1 Queen bed(s) Bed
Double Room

Food & Drink

Tea/Coffee maker

Bathroom

Toilet paper, Toilet, Shower, Private bathroom, Towels, Bathtub or shower, Bathrobe, Shampoo

Media & Technology

Flat-screen TV, TV

Bedroom

Wardrobe or closet, Extra long beds (> 6.5 ft), Linens

General

Trash cans, Smoke Alarm, Carbon monoxide detector, Carbon monoxide sources, Heating, Key card access

View

Garden view, View

Kitchen

Electric kettle, Coffee machine

Outdoors

Terrace

Accessibility

Entire unit wheelchair accessible, Hearing accessible, Entire unit located on ground floor

Room Amenities

Socket near the bed, Clothes rack, Drying rack for clothing

Entertainment & Family Services

Books, DVDs or music for children, Board games/puzzles

Pool and Spa

Pool towels, Pool cover, Heated pool, Saltwater pool
King Room with Garden View
Room Type: Double
Room Size: 18 m2
1 Queen bed(s) Bed
King Room with Garden View

Food & Drink

Tea/Coffee maker

Bathroom

Toilet paper, Toilet, Shower, Private bathroom, Towels, Bathtub or shower, Bathrobe, Shampoo

Media & Technology

Flat-screen TV, TV

Bedroom

Wardrobe or closet, Extra long beds (> 6.5 ft), Linens

General

Trash cans, Smoke Alarm, Carbon monoxide detector, Heating, Key card access

View

Garden view, View

Kitchen

Electric kettle, Coffee machine

Outdoors

Terrace

Accessibility

Entire unit wheelchair accessible, Hearing accessible, Entire unit located on ground floor

Room Amenities

Socket near the bed, Clothes rack, Drying rack for clothing

Entertainment & Family Services

Books, DVDs or music for children, Board games/puzzles

Pool and Spa

Pool towels, Pool cover, Heated pool, Saltwater pool
King Room with Garden View
Room Type: Double
Room Size: 21 m2
1 Queen bed(s) Bed
King Room with Garden View

Food & Drink

Tea/Coffee maker

Bathroom

Toilet paper, Toilet, Shower, Private bathroom, Towels, Bathtub or shower, Bathrobe, Shampoo, Walk-in shower

Media & Technology

Flat-screen TV, TV

General

Trash cans, Smoke Alarm, Carbon monoxide detector, Heating, Key card access

View

Garden view, View

Kitchen

Electric kettle, Coffee machine

Bedroom

Linens, Wardrobe or closet

Outdoors

Terrace

Accessibility

Entire unit wheelchair accessible, Hearing accessible, Roll-in shower, Entire unit located on ground floor

Room Amenities

Socket near the bed, Clothes rack, Drying rack for clothing

Entertainment & Family Services

Books, DVDs or music for children, Board games/puzzles

Pool and Spa

Pool towels, Pool cover, Heated pool, Saltwater pool

FAQ's

Is this Onze Kas pet-friendly for guests?

No, pets are not allowed at this property. Check the guest reviews to learn what guests had to share.

What time is check-in & check-out at Onze Kas?

Check-in time for Onze Kas starts counting from 3:00 PM and check-out is until 11:00 AM. However, early check-in or late check-out can sometimes be negotiated between the guest and the owner or the manager of this property.

Does the Onze Kas have a swimming pool?

Yes, this Onze Kas has a swimming pool. Check the Facility Overview section for details about the pool and other available facilities.

How much does it cost per night to stay in Onze Kas?

Best-rates for the Onze Kas starts from $130 per night with includes TV, View, Oceanfront, Fireplace/Heating, Guest Services, Parking, Pool, Ocean View, Sports/Activities, Kitchen, Child Friendly, Internet, Balcony/Terrace, Security/Safety, Entertainment with all other facilities. RBO matches every traveller with their perfect accommodation, whether you are travelling with a group, friends, family, or pets.

Is Onze Kas a family-friendly place to stay?

Based on the information we have received from the owner or our partner, this is considered to be a family-friendly property. Families have rated this hotel Good or guests have recommended them suitable for families. As reported by the owner or manager, the hotel has specified that children are welcome. Please see details about suitability for your family or inquire with the property to learn more.

Is the Onze Kas wheelchair accessible or offer services for disabled guests?

Based on the information received from our partner, the Onze Kas has not specified they are wheelchair accessible. Likewise, there is not an elevator specified as being available at the property. Specific accessibility details may be addressed in the property details section of this page.

What is the minimum night stay policy for the Onze Kas?

Based on the information reported by the owner or manager, the Onze Kas indicates 1 day stay policy at this hotel. Guests are cautioned that the minimum stay policy may differ based on seasonality or availability and may be at the discretion of the owner or manager.

What cancellation policy is in place for Onze Kas?

Based on the information reported by the owner or manager, details for the cancellation policy for the Onze Kas are as follows: Free cancellation Guests are cautioned that the cancellation policy may differ based on seasonality, availability, or current travel restrictions. Guests should also be aware that this policy may be subject to change and should be confirmed prior to booking. More details may be available on this page in the property description. However, early check-in or late check-out can sometimes be negotiated between the guest and the owner or the manager of this property.

People Also Ask

Check Hotel Availability
Nightly rates from:
US $130
You will be redirected to  
Hot Deal - It has been viewed 138 times today
Not the right fit? Check out our other properties in Lelystad
9.0 (2 Reviews)
Boat Rental
  • Parking
  • TV
  • Balcony/Terrace
|
10.0 (1 Review)
Bed & Breakfast
  • Air Conditioner
  • Parking
  • Pool
|
9.4 (52 Reviews)
Bed & Breakfast
  • Air Conditioner
  • Parking
  • TV
7.0 (10 Reviews)
Boat Rental
  • Parking
  • Pet Friendly
  • Security/Safety
|
9.4 (81 Reviews)
Apartment
  • Air Conditioner
  • Parking
  • Designated Smoking Area
10.0 (2 Reviews)
Apartment
  • Wheelchair Accessible
  • Balcony/Terrace
  • Accessibility
|
9.4 (73 Reviews)
House
  • Air Conditioner
  • Parking
  • Balcony/Terrace
|
9.4 (60 Reviews)
House
  • Parking
  • Balcony/Terrace
  • Security/Safety
|
9.4 (47 Reviews)
Bed & Breakfast
  • Parking
  • Designated Smoking Area
  • View
|
9.3 (227 Reviews)
Apartment
  • Air Conditioner
  • Parking
  • View
|
9.1 (69 Reviews)
House
  • Parking
  • View
  • Wheelchair Accessible
9.0 (23 Reviews)
Boat Rental
  • Air Conditioner
  • Parking
  • Balcony/Terrace
|
8.9 (753 Reviews)
Bed & Breakfast
  • Air Conditioner
  • Parking
  • Pet Friendly
5.0 (7 Reviews)
Other
  • TV
  • Balcony/Terrace
  • Bedding/Linens